Connector library

Implemented source Collaboration & Productivity APIs

Smartsheet connector.

Retrieve a page of Smartsheet sheet rows and its columns, retrieve a row, add a row and update its selected cell values through API 2.0.

Connector download

Download Smartsheet

Versioned ZIP for your CXFabric tenant.

Use this connector in a flow

  1. Register the ZIP in your tenant, or add a new version if the connector is already installed.
  2. Create or select a credential if the action requires one.
  3. In a Draft flow, add an available action, choose its version, connect it, and map inputs.
  4. Test the step and flow; review output and failures before activation.

See readme.md in the ZIP for settings and limitations.

Version
v0.2.0.1 Choose version
Release
2026-10-03
Package
Implemented source
Schema credentials
Bearer token
Connection settings
API Base URL
Package size
8 KB
SHA-256
aaf404159140d4d3b9eb68137a2aabbb0697f3e01c18abcaa713588d26ded0d8

Version history

What's new

  1. v0.2.0.1Latest · 2026-10-03 · Implemented source

    Improves action labels, mapping hints and connection groups while retaining the existing parameter keys, types, defaults, credentials and result contracts.

  2. v0.2.0.0Earlier · 2026-10-03 · Implemented source

    Retrieve a page of Smartsheet sheet rows and its columns, retrieve a row, add a row and update its selected cell values through API 2.0.

  3. v0.1.1.0Earlier · 2026-10-02 · Starter scaffold

    Retained immutable historical scaffold archive.

Included in this version

Included actions

Implemented in v0.2.0.1. Use a separate flow trigger; no webhook trigger is included.

Get sheet page

Retrieve columns and one bounded page of rows.

Get row

Retrieve a row and its cell values.

Add row

Append one row at the bottom of a sheet.

Update row cells

Change selected cells in one existing row; other cells are preserved.

Vendor API

API and access

Implementation considerations
  • Confirm project IDs, board/list IDs, status transition rules, custom fields, and user mapping before enabling writes.
  • Use external IDs or links back to source records so duplicate workflow retries do not create duplicate tasks.
  • For broad work-management APIs, start with create/update/comment/transition before advanced reporting.

Support

Need help with Smartsheet?

Tell us what you need to connect or change.